This resource is no longer available

Cover Image

Productivity in capital projects has stagnated for decades – the average capital project schedule lags by 20 months and goes over budget by 80%.

Take this brief survey and learn how AVEVA Unified Engineering helps reduce Total Installed Costs (TIC) of capital projects by a minimum of 5% and provides project cost and schedule predictability. AVEVA Unified Engineering ensures you are in a stronger position to control project risks and cost overruns.

Vendor:
Aveva
Posted:
Mar 23, 2023
Published:
Mar 23, 2023
Format:
PDF
Type:
Brochure

This resource is no longer available.