This resource is no longer available

Maintaining High Availability During Hurricane Irma: A Case Study

Cover

As Hurricane Irma barreled towards Florida, leaving a swath of destruction miles wide in its wake, Peak 10 + ViaWest, a hybrid cloud provider was focusing on protecting the availability and integrity of their customer’s infrastructure.

Inside, learn how their proactive emergency preparation process kept this information safe, and the servers up-and-running with:

  • Redundant UPS systems and generators with N+1 or 2N configurations to ensure uninterrupted power supplies
  • A frequently tested emergency which made sure that everyone knew exactly what to do to keep IT teams safe and data online
  • A mobile response team that offered auxiliary aid and allowed local personnel to return home to weather the storm with their families
  • And more
Vendor:
Peak10
Posted:
13 Nov 2017
Published:
13 Nov 2017
Format:
PDF
Length:
3 Page(s)
Type:
White Paper
Language:
English

This resource is no longer available.