Hardware  >  

Electric Energy Equipment

RSS Feed    Add to Google    Add to My Yahoo!
Electric Energy Equipment White Papers (View All Report Types)
 
Four Steps to Determine When a Standby Generator is Needed for Small Data Centers and Network Rooms
sponsored by Schneider Electric
WHITE PAPER: Small data centers and network rooms vary dramatically in the amount of uninterruptible power supply (UPS) runtime deployed. This paper identifies four steps to identifying if a standby generator is required.
Posted: 01 Apr 2010 | Published: 01 Jul 2007

Schneider Electric

Data Center Physical Infrastructure for Enterprise Wireless LANs
sponsored by Schneider Electric
WHITE PAPER: Understanding the unique Network-Critical Physical Infrastructure (NCPI) requirements of Wireless LAN (WLAN) equipment allows for a successful deployment. Discover how to plan for NCPI while deploying indoor WLANs, with emphasis on power and cooling.
Posted: 09 Jul 2007 | Published: 01 Feb 2005

Schneider Electric

Conducting an Accurate Utility Cost Analysis Based on UPS Efficiency
sponsored by Emerson Network Power
WHITE PAPER: Explore this resource to learn what UPS efficiency ratings mean, how capacity utilization affects your UPS' effiency, and how you can choose the best UPS for your data centre by running a simple cost analysis. Read on now to learn more.
Posted: 25 Jun 2014 | Published: 31 Dec 2011

Emerson Network Power

Tackling Today's Data Center Energy Efficiency Challenges - A Software-Oriented Approach
sponsored by Square D Critical Power Competency Center
WHITE PAPER: Get an overview of a software-based approach to effectively measuring, monitoring and managing data center energy consumption.
Posted: 22 Aug 2007 | Published: 01 May 2007

Square D Critical Power Competency Center

Data Center Projects: Commissioning
sponsored by Schneider Electric
WHITE PAPER: The commissioning process flow is described and critical success factors are discussed. The commissioning process inputs and outputs are also placed in context with other key data center project process phases and steps.
Posted: 02 Nov 2009 | Published: 02 Nov 2009

Schneider Electric

A More Efficient Data Center with Viridity EnergyCenter Software
sponsored by Viridity Software
WHITE PAPER: The obstacles for not measuring power consumption are real, but not having information often leads to major operational and strategic issues. Read this whitepaper to learn how to begin energy optimization and energy resource management with Viridity's EnergyCenter software.
Posted: 11 Aug 2010 | Published: 11 Aug 2010

Viridity Software

Case Study: IBM Teams with Schneider Electric for Large-Scale Data Center Construction
sponsored by Schneider Electric
WHITE PAPER: Explore this concise white paper to uncover who industry leader IBM chose as their partner to undertake this challenge and how they met each goal on schedule along the way. Read on to learn which organization could keep pace with IBM to deliver the power, cooling, and single window monitoring solutions they needed.
Posted: 20 Nov 2014 | Published: 14 Nov 2012

Schneider Electric

Battery Technology Data Centers and Network Rooms: Lead-Acid Battery Options
sponsored by Schneider Electric
WHITE PAPER: This paper discusses the advantages and disadvantages of Flooded, Valve Regulated Lead Acid (VLRA), and Modular Battery Catridge (MBC) lead-acid battery technologies.
Posted: 04 Feb 2009 | Published: 04 Feb 2009

Schneider Electric

The Role of Isolation Transformers in Data Center UPS Systems
sponsored by Schneider Electric
WHITE PAPER: Most modern UPS systems do not include the internal transformers that were present in earlier designs. This evolution has increased efficiency while decreasing the weight, size, and raw materials consumption of UPS systems.
Posted: 09 Nov 2010 | Published: 09 Nov 2010

Schneider Electric

System Grounding and Ground Fault Protection for Data Centers
sponsored by Square D Critical Power Competency Center
WHITE PAPER: This paper presents the fundamentals of power system grounding, definitions and requirements of the National Electrical Code with respect to grounding, the need for low voltage ground fault protection and how it is implemented.
Posted: 05 Nov 2008 | Published: 05 Nov 2008

Square D Critical Power Competency Center
 
 
Visit WhatIs.com - a knowledge exploration and self-education tool about information technology.

About TechTarget:

TechTarget provides enterprise IT professionals with the information they need to perform their jobs - from developing strategy, to making cost-effective IT purchase decisions and managing their organizations' IT projects - with its network of technology-specific Web sites, events and magazines

All Rights Reserved, Copyright 2000 - 2016, TechTarget | Read our Privacy Statement