SvSAN virtually eliminates hardware failure across 6 ROBOs

Case Study: Mills & Reeve Virtually Eliminates Branch Office Downtime with SvSAN

Cover

For UK law firm Mills & Reeve, downtime isn’t an option. However, lack of resilience in the local server set-up offered little protection against failure. Moreover, they were also planning the roll-out of scanning software to all six branches, which could not be performed over the WAN to the data center, as it required too much bandwidth.

Only a highly available and resilient solution would improve recoverability. This study of Mills & Reeve demonstrates how they virtually eliminated downtime associated with hardware failures across their 6 branch offices with SvSAN, a virtual SAN operating in a hyperconverged configuration.

Read on to see a technical rundown of SvSAN’s server configuration, and the architecture in action. 

Vendor:
StorMagic
Posted:
26 Sep 2017
Published:
26 Sep 2017
Format:
PDF
Length:
2 Page(s)
Type:
Case Study
Language:
English
Already a Bitpipe member? Login here

Download this Case Study!

By submitting your personal information, you agree that TechTarget and its partners may contact you regarding relevant content, products and special offers.

You also agree that your personal information may be transferred and processed in the United States, and that you have read and agree to the Terms of Use and the Privacy Policy.