|
|
Consolidating Multiple Oracle OLTP Workloads on the Dell PowerEdge R710 Server
sponsored by Dell, Inc. and Intel
|
|
An enterprise database system may be running DSS, OLTP, or a mixed workload of both. This white paper concentrates on server consolidation for an Oracle database running OLTP workloads on legacy platforms. The goal of this study is to determine if a multi‐node Oracle RAC cluster can be replaced with a cluster consisting of fewer Dell PowerEdge 11G nodes (powered by Intel® Xeon® processor 5500 Series), and still process the OLTP workload faster with less power consumption and lower Oracle RAC licensing fees. Read this white paper to learn more.
(THIS RESOURCE IS NO LONGER AVAILABLE.)
|
|
|
|
Available Resources from Dell, Inc. and Intel
|
.
|
|
|
TechTarget provides enterprise IT professionals with the information they need to perform their jobs
- from developing strategy, to making cost-effective IT purchase decisions and managing their
organizations' IT projects - with its network of
|
|
|
Definitions:
|
|
 |
|
All Rights Reserved,
Copyright 2000 - 2012, TechTarget |
|
|
|
|