Best Practices for Power Equipment Startup

Cover

In order for the electrical power distribution systems within data centers and related facilities to operate properly as designed and intended, it is extremely important that care be given to the commissioning and startup of the electrical equipment via effective and reliable methods. This paper describes the need for a systematized program for new power equipment startup and the best practices and pitfalls that exist with regards to power equipment startup. This paper will also provide an overview of important items and issues that should be focused upon as part of reliable power equipment start up procedures and processes.

Author

Frank Waterer Square D Engineering Services
Vendor:
Square D Critical Power Competency Center
Posted:
12 Feb 2009
Published
12 Feb 2009
Format:
PDF
Length:
11 Page(s)
Type:
White Paper