|
|
sponsored by Aperture Technologies, Inc
|
|
|
Posted:
|
08 Feb 2008
|
|
Published:
|
01 Apr 2007
|
|
Format:
|
PDF
|
|
Length:
|
8
Page(s)
|
|
Type:
|
White Paper
|
|
Language:
|
English
|
|
|
ABSTRACT:
Even though most professionals surveyed had built a new data center in the last four years, almost 90% of them said their racks were already three-quarters full. The vast majority of data centers (over 91%) have deployed high-density equipment to fully exploit the space available, but a worrying percentage are not adequately managing the power density of their racks, with an alarming 21% unaware of their maximum power density per rack. Data centers need to ensure that their rush to install high-density equipment is matched by a genuine ability to manage power and cooling. High density equipment helps the data center to keep up with the demands of business, but if organizations continue to operate close to thresholds, they can also dramatically increase the risk of outage. In many cases the widespread use of high-density equipment is putting a strain on data center infrastructure, massively reducing any margin for error, with human error remaining the number one cause of outage.
|
|
|
|
BROWSE RELATED
RESOURCES
Blade Servers | Call Centers | Capacity Planning | Cooling Equipment | Data Centers | Deployment | Downtime | Hardware Installation | Network Infrastructure | Personal Computers | Power Generation Equipment | Rack Servers | Server Consolidation
|
View All Resources
sponsored by Aperture Technologies, Inc
|
|
|
|
|
|
TechTarget provides enterprise IT professionals with the information they need to perform their jobs
- from developing strategy, to making cost-effective IT purchase decisions and managing their
organizations' IT projects - with its network of
|
|
|
Definitions:
|
|
 |
|
|
All Rights Reserved,
Copyright 2000 - 2007, TechTarget |
|
|
|
|