Calculating Total Power Requirements for Data Centers
sponsored by APC by Schneider Electric
|
|
Part of data center planning and design is to align the power and cooling requirements of the IT equipment with the capacity of infrastructure equipment to provide it. This paper presents methods for calculating power and cooling requirements and provides guidelines for determining the total electrical power capacity needed to support the data center, including IT equipment, cooling equipment, lighting, and power backup.
(THIS RESOURCE IS NO LONGER AVAILABLE.)
|
|
|
.
|
|
|