This resource is no longer available

Reducing the Hidden Costs Associated with Upgrades of Data Center Power Capacity

Cover

The ability to scale Uninterruptible Power Supply (UPS) systems "on the fly" in response to load growth without incurring downtime contributes directly to the bottom line of a company employing such a strategy. In this white paper, the real costs of UPS capacity expansion employing a legacy type of UPS will be compared and contrasted to the costs of employing a scalable UPS system

Author

Richard L. Sawyer Sr. Systems Application Engineer, APC (American Power Conversion Corporation) Richard L. Sawyer is a Sr. Systems Application Engineer for APC. He has 25 years of experience in large scale data center construction and operations for Fortune 100 companies. He is on the Board of Directors, AFCOM.
Vendor:
Schneider Electric
Posted:
13 Jan 2005
Published
01 Feb 2005
Format:
PDF
Length:
7 Page(s)
Type:
White Paper
Language:
English

This resource is no longer available.